General Contractor: Metropac Water Investment Corporation
Fit-Out Renovation Works:
- Drywall Partition using 12mm Gypsum Board with Rockwool Insulation
- Tiling Works using Floor Carpet, Rubber Floor, Wood Tiles, Wall Tiles Lavatory Counter top
- Flat Ceiling using 12mm Gypsum Board & 13mm Moisture Resistant Gypsum board
- Installation of Wood Veneer Ceiling
- Installation of Wood Slat Ceiling
- Supply & Installation of Glass (Glazing Works – Fixed glass with door)
- Supply & Installation of Marine Plywood and Laminated Formica (Cladding works)
- Supply & Installation Plumbing works
- Supply & Installation of Electrical & Lighting Fixture
- Fire Protection Works
- Mechanical Works
- Supply & Application of Painting Works






